Post by girardenterprise on May 19, 2023 23:35:59 GMT
Would be nice to have the option to lock out material Q grades from being consumed to ensure Q grade of finished product and reduce potential oversight issues.
Example
iron stock of q0 and Q3 on hand.
Making RC that can be locked from using Q3 Iron so that Q0 can be used to make RC. without “blocking Perminant use” like current setup keeping costs lower and allowing the high Q to be used for appropriate needs that matter. Without micromanaging as much.
This could be achieved by an option of highing a logistics or purchasing employee. Or AI position where you need to implement a software system for a set fee per lvl of the building. Say 100k per lvl of building for the option.
|
|